Monday, September 28, 2015
Berlin (works)
Services on tram lines 12 and 27 in Berlin (Germany) are suspended between Pasedagplatz and Berliner Allee / Rennbahnstraße during about a month.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) October 3rd.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) October 3rd.
Saturday, September 26, 2015
Paris (works)
In coming weeks, the RER A in Paris (France) will be replaced by bus services between Maisons-Laffitte and Poissy on weekday evenings.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
Next update planned on (or around) October 2nd.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
- Paris-travaux (complete rail network)
- Paris-full-travaux (subway, RER and inner city bus networks).
Next update planned on (or around) October 2nd.
Berlin (works)
The long-term interruption of service between "Marktstraße" and "Rummelsburg" on tram line 21 in Berlin (Germany) seems to have ended early.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 28th.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 28th.
Tehran
An extension was opened on metro line 3 in Tehran (Iran), with many intermediary stations not yet served.
Monday, September 21, 2015
Paris
Earlier this month, late evening and Sunday services have been extended on bus line 74 in Paris (France).
Berlin (works)
Starting today and for about 2 weeks, tram lines M17, 21, 37, 63 and 67 in Berlin (Germany) are replaced by bus services between Schöneweide and Wilhelminenhofstraße/Edisonstraße.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 28th.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 28th.
Saturday, September 19, 2015
Venezia
The tram has finally arrived in Venezia (Italy), with the new extension that just opened on the network that originated in nearby Mestre.
Paris (works)
The late evening disruptions of the past week on the RER B in Paris (France) have ended last night (for the time being).
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
Next update planned on (or around) October 1st, at the latest.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
- Paris-travaux (complete rail network)
- Paris-full-travaux (subway, RER and inner city bus networks).
Next update planned on (or around) October 1st, at the latest.
Berlin (works)
The temporary works that affected tram line 21 in Berlin (Germany), between Frankfurter Tor and Marktstraße, have ended.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 21st.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on (or around) September 21st.
Sunday, September 13, 2015
New York
A new station ("34th Street-Hudson Yards") has opened this morning in Manhattan, on line 7 of the New York (USA) subway.
Madrid (works)
The end of the disruptions on metro line 6 in Madrid (Spain) last night signals the end of the summer works campaign for 2015.
Users of our "works" database should now revert to the regular version, which can be downloaded here or through our online update services (also embedded in most versions of the app).
Users of our "works" database should now revert to the regular version, which can be downloaded here or through our online update services (also embedded in most versions of the app).
Portland
A new "MAX" light rail line (the "orange line") was inaugurated yesterday in Portland, OR (USA), while the streetcar CL route has been transformed into a pair of loop lines.
Saturday, September 12, 2015
Paris (works)
Next week, the RER B in Paris (France) will be replaced by bus services between Aulnay and Roissy-CDG on late evenings every weekday.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
Next update planned on (or around) September 19th.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:
- Paris-travaux (complete rail network)
- Paris-full-travaux (subway, RER and inner city bus networks).
Next update planned on (or around) September 19th.
Friday, September 11, 2015
Berlin (works)
The disruptions on subway line U5 in Berlin (Germany) have ended, while it is now the turn of line U8 to have its service modified on Sunday to Thursday evenings.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on October 9th, at the latest.
Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).
Next update on October 9th, at the latest.
Berlin
L. Freund reported that tram lines M8 and M10 in Berlin (Germany) have had their routes extended beyond Nordbahnhof, toward Hauptbahnhof.
Monday, September 07, 2015
Paris (works)
Yesterday's disruptions on subway line 5 and tram line T1 in Paris (France) have ended. Station "Louvre-Rivoli" (subway line 1) has closed this morning for renovation works.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:
Next update planned on (or around) September 14th.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:
- Paris-travaux (complete rail network)
- Paris-full-travaux (subway, RER and inner city bus networks).
Next update planned on (or around) September 14th.
Sunday, September 06, 2015
Cracow
The recent opening of a new section on the tram network in Cracow (Poland) has provided an opportunity to refresh our database (leaving out the few bus lines it included so far, however).
Madrid (works)
The works of the Summer on metro line 12 ("MetroSur") in Madrid (Spain) have ended last night.
Download the special "works" database here or with our online update services (also embedded in most versions of the app, e.g. on iPhone, Android, BlackBerry, Bada...).
Next change planned around mid-September.
Download the special "works" database here or with our online update services (also embedded in most versions of the app, e.g. on iPhone, Android, BlackBerry, Bada...).
Next change planned around mid-September.
Saturday, September 05, 2015
Paris (works)
The disruptions affecting subway line 5 tomorrow from 8:45 to 17:30 in Paris (France) will also impact tram line T1.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:
Next update planned on (or around) September 7th.
Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:
- Paris-travaux (complete rail network)
- Paris-full-travaux (subway, RER and inner city bus networks).
Next update planned on (or around) September 7th.
Subscribe to:
Posts (Atom)